Portland I5 Bridge Closure. In september 2020, the northbound lanes of the interstate bridge closed for 7 days as crews replaced a cracked trunnion and other parts that help lift and lower the bridge. Stay up to date with.
(may 16, 2024) the portland aerial tram will close for scheduled maintenance from 7 p.m. On thursday, may 23, reopening at 5:30.
Thursday For Emergency Work After A Bridge Joint Failed And Needs Repair, According To The Oregon Department.
The oregon department of transportation will close the northbound lanes of the interstate 5 bridge from oregon to washington 10 p.m.
Due To The Instability Of The Soil On Which.
On thursday, may 23, reopening at 5:30.
28, 2024 At 5:37 Pm Pdt.
Images References :
On Thursday Due To An Emergency Repair Of A Bridge Joint That Failed.
Our maps show updates on road construction, traffic accidents, travel delays and the latest traffic speeds.
28, 2024 At 5:37 Pm Pdt.
Interstate 5 provides a critical connection between oregon and washington that supports local jobs and families, and is a vital trade route for regional, national and international.
Portland Politicians, Transportation Leaders, And Other Stakeholders Have All Agreed Upon The Preliminary Design For The Interstate 5 Bridge Replacement Project As Of.